Beawar-Pali-Pindwara (Rajasthan)

The NHAI project for the development of four laning of 244 km long stretch connecting Beawar-Pali-Pindwara section on NH 14 in Rajasthan, under NHDP Phase III, is being executed by L&T BPP Tollway Limited (L&T BPPTL), a 100% shareholding venture of L&T IDPL. This section is considered to be one of the main evacuation routes for traffic from Kandla and Mundra Ports travelling towards Northern India - to Rajasthan, Haryana, Delhi, Punjab and beyond. The Project Corridor falls within the proposed Delhi-Mumbai Industrial Corridor (DMIC) and the four-laning of the 244 km stretch on NH-14 within this industrial corridor is expected to accelerate the development and growth prospects in this region. L&T BPPTL will be responsible for the design, construction, funding, operations and maintenance of this DBFOT project. The concession period of this INR 24.72 billion project is 23 years, inclusive of the construction period.